Menu
Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17 Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17

Woodside, Aspley Guise, Milton Keynes, Bedfordshire, MK17

£1,900,000.00 inc. tax
Share

Modern detached house

Four/five bedrooms

Three bathrooms

Three reception rooms

Fitted kitchen/breakfast room, pantry and utility room

Mature garden

Driveway and garage

Village location

A modern four/five bedroom detached house with an in and out gated driveway, an integral garage, and an enclosed rear garden within walking distance of local amenities. The property was built 10 years ago for the current owners and has just under 3,300 sq. ft. of versatile accommodation including a sitting room, a study, and an open plan kitchen/dining/family room with adjoining utility room on the ground floor. There are four double bedrooms and four bath or shower rooms on the first floor and a room on the second floor which is currently used as a games room but which could be used as an additional bedroom or could be converted into a separate apartment for staff or a teenager wanting some independence.

The house has a sound system with ceiling speakers and wet underfloor heating throughout the ground floor. The top two floors have radiators, and all the bathrooms have underfloor heating and towel radiators.

The property is set back from the road with driveway parking in addition to the L-shaped garage which has space for one car as well as a workshop area.

Product Code: 1Yx0iaI
Product Condition: New
Description
Details
Reviews
Withdraw from contract